Search scope:
排序: Display mode:
The Current State and Future of Deep Water Subsea Production Technology
Li Qingping,Zhu Haishan and Li Xinzhong
Strategic Study of CAE 2016, Volume 18, Issue 2, Pages 76-84 doi: 10.15302/J-SSCAE-2016.02.009
The subsea production system was developed from a submerged wellhead to half dry-type subsea wellheadto a whole wet-type subsea wellhead.Up to now, the subsea production system has established including the subsea wellhead, subsea pipe network, subsea manifold, subsea remote control system, and others.Until 2014, there were 6,400 subsea completed wells, about 320 subsea oil and gas fields in the world
Keywords: subsea wellhead subsea production system localization
Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel
Qu Shouxin
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 24-29
Keywords: Xiamen Xiang’an subsea tunnel construction technology preliminary conclusions of experience
Study on water pressure characteristics of Xiamen Xiang’an Subsea Tunnel
Cheng Zhengming
Strategic Study of CAE 2012, Volume 14, Issue 11, Pages 29-35
Keywords: subsea tunnel lining water pressure model test limited drainage reduction
Risk assessment on Bohai Bay subsea tunnel in its operational period
Wang Yonghong,Liu Bing,Zhang Yonggang
Strategic Study of CAE 2013, Volume 15, Issue 12, Pages 107-112
The operation of super-long subsea tunnel is a extremly complex systemThe procedure of risk assessment was explained in detail,and its application on Bohai Bay subsea tunnelFirstly, lots of different risk factors of the subsea tunnel operation were identified systematicallyFinally,some topics about risk assessment on the subsea tunnel operational risk needed to the further
Keywords: subsea tunnel operational period risk analysis risk assessment
Key tunneling technology and configuring big machines in Qingdao Jiaozhouwan subsea tunnel
Ma Dong,Tan Zhongsheng
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 45-52
Qingdao Jiaozhouwan tunnel is 7 800 m, and subsea tunnel is 3 950 m.Space between the center lines of the 2 main traffic subsea tunnesl is 55 m.technology and configuring big machines of drilling and blast for constructing Qingdao Jiaozhouwan subsea
Keywords: Jiaozhouwan subsea tunnel drilling & blast construct configuring big machines
Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel
Guo Xiaohong,Wang Mengshu
Strategic Study of CAE 2011, Volume 13, Issue 9, Pages 38-41
Keywords: Ximen Xiang’an Subsea Tunnel grouting reinforcement stability numerical simulation
Study on waterproof and drainage technology of drilling and blast subsea tunnel
Wang Xiuying,Tan Zhongsheng,Wang Mengshu
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 71-75
The waterproof and drainage principle for subsea tunnel is clarified.Based on Xiamen subsea tunnel, the suitable discharge is discussed.the main problems that must be paid attention to and questions that must be studied further during subseaThe design method of waterproof and drainage system for subsea tunnel is a reference for other subsea
Keywords: subsea tunnel waterproof and drainage of structure discharge design
Application of subsea multiphase flow meter in the development of deepwater oil and gas fields
Liu Taiyuan,Guo Hong and Zheng Lijun
Strategic Study of CAE 2012, Volume 14, Issue 11, Pages 69-74
Keywords: deepwater subsea multiphase flow meter flow assurance reservoir optimization field development
Liu Taiyuan,HuoChengsuo,Li Qingping,Wan Xiang and Li Wenying
Strategic Study of CAE 2015, Volume 17, Issue 1, Pages 51-55
With remarkable investment into deep water block exploration,subsea production systems are acceptedSubsea production system technologies have been developed rapidly and give some new trends.On the general introduction of subsea production system,new trends are given in this paper,furthermore
The security monitoring and controlled drainage of Xiamen Subsea Tunnel
Du Chaowei,Wang Mengshu,Tan Zhongsheng
Strategic Study of CAE 2011, Volume 13, Issue 3, Pages 86-91
Keywords: Xiamen Subsea Tunnel controlled drainage construction monitoring water pressure water inflow
Information construction of the subsea tunnel in a fault and crush zone
Yang Huijun,Wang Mengshu,Zhuo Yue,Luo Song
Strategic Study of CAE 2012, Volume 14, Issue 10, Pages 57-64
The construction of the excavation and support of the subsea tunnel isRelying on the construction of a fault and crush zone of the second subsea tunnel inland, using the methodrock, by processing of data, and to the construction, is called the information construction of the subsea
Keywords: a fault and crush zone of subsea tunnel comprehensive pre geology prediction full sectional grouting
Study on key construction technologies of Xiamen Xiang’an subsea tunnel
Fu Hongxian,Liu Yongsheng,Guo Yanjing,Huang Mingqi
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 30-34
Xiamen Xiang'an subsea tunnel is the first subsea tunnel in ChinaIts subsea geological condition is granite.Drilling hole and blasting parameters trials are carried out
Keywords: Xiamen Xiang’an subsea tunnel excavation method working procedure controlling measure blasting
Wang Kai,Zhang Chengping,Wang Mengshu
Strategic Study of CAE 2012, Volume 14, Issue 1, Pages 90-97
Aiming at the asymmetric double-arch tunnel engineering that lies at Jiaozhou Bay in Qingdao, the section located in the intersection between main tunnel and ramb tunnel is chosen as a typical cross section and a three-dimensional model for numerical analysis. Four construction schemes are constituted according to different construction sequences and different digging lengths. Then these schemes are simulated with FLAC3D program. By analyzing ground surface settlement, vault settlement values, displacement of supporting structure, principle stress in surrounding rock, as well as principle stress in supporting structure, the most disadvantage position of structural deformation and stress during construction is determined. It concludes that the surrounding rock deformation could be better controlled by using of the construction sequence that first middle drift and then right hole of ramb tunnel, and the reasonable construction scheme is suggested.
Keywords: subsea tunnel asymmetric double arch tunnel construction scheme optimization construction sequence
The location choice and construction technology of shafts in Bohai Strait tunnel
Wang Yunlong,Tan Zhongsheng
Strategic Study of CAE 2013, Volume 15, Issue 12, Pages 85-89
Keywords: subsea tunnel shaft ventilation construction technology
Supporting structure form and parameters design of Bohai Strait tunnel
Wan Fei,Wang Yunlong,Wu Yongsheng
Strategic Study of CAE 2013, Volume 15, Issue 12, Pages 61-66
Referring to the successful experience of subsea tunnels having been
Keywords: Bohai Strait subsea tunnel structure form design parameters
Title Author Date Type Operation
The Current State and Future of Deep Water Subsea Production Technology
Li Qingping,Zhu Haishan and Li Xinzhong
Journal Article
Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel
Qu Shouxin
Journal Article
Study on water pressure characteristics of Xiamen Xiang’an Subsea Tunnel
Cheng Zhengming
Journal Article
Risk assessment on Bohai Bay subsea tunnel in its operational period
Wang Yonghong,Liu Bing,Zhang Yonggang
Journal Article
Key tunneling technology and configuring big machines in Qingdao Jiaozhouwan subsea tunnel
Ma Dong,Tan Zhongsheng
Journal Article
Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel
Guo Xiaohong,Wang Mengshu
Journal Article
Study on waterproof and drainage technology of drilling and blast subsea tunnel
Wang Xiuying,Tan Zhongsheng,Wang Mengshu
Journal Article
Application of subsea multiphase flow meter in the development of deepwater oil and gas fields
Liu Taiyuan,Guo Hong and Zheng Lijun
Journal Article
Trends in subsea production system and its application in offshore oil and gas field development in South
Liu Taiyuan,HuoChengsuo,Li Qingping,Wan Xiang and Li Wenying
Journal Article
The security monitoring and controlled drainage of Xiamen Subsea Tunnel
Du Chaowei,Wang Mengshu,Tan Zhongsheng
Journal Article
Information construction of the subsea tunnel in a fault and crush zone
Yang Huijun,Wang Mengshu,Zhuo Yue,Luo Song
Journal Article
Study on key construction technologies of Xiamen Xiang’an subsea tunnel
Fu Hongxian,Liu Yongsheng,Guo Yanjing,Huang Mingqi
Journal Article
Research on construction optimization of asymmetric double arch section in Jiaozhou Bay Subsea Tunnel
Wang Kai,Zhang Chengping,Wang Mengshu
Journal Article
The location choice and construction technology of shafts in Bohai Strait tunnel
Wang Yunlong,Tan Zhongsheng
Journal Article